Pool estimate template: line items and quantities

By the PoolSketch team at Tegminestar. Published . Updated .

Short answer. A pool estimate lists every cost line with a quantity and a unit cost: design and permits, excavation, shell, plumbing, electrical, equipment, finishes, decking, fencing, startup and a contingency. Measure the quantities from the plan, price them with your own costs, and show a total and the exclusions.

What lines belong in a pool estimate?

SectionTypical linesQuantity comes from
1. Design and approvalsDesign, survey, engineering, permit fees, HOA submissionFixed or allowance
2. Site workLayout, excavation, haul-off, access protection, drainageRough excavation in cubic yards
3. ShellSteel and shotcrete, fiberglass shell and set, or liner and wallsSurface area, depth, perimeter
4. Plumbing and electricalPlumbing runs, bonding, GFCI, lighting, service workDistance from equipment to pool
5. EquipmentPump, filter, heater, cleaner, automation, salt or sanitiser systemVolume in gallons
6. FinishesInterior finish, waterline tile, copingSurface area; linear feet of tile and coping
7. Decking and surroundingsDeck, steps, walls, landscaping, fence or barrierDeck square feet; linear feet of barrier
8. FeaturesSpa, shelf, water features, fire, lighting, coverCount per feature
9. StartupFill, chemicals, orientation, first serviceVolume in gallons
10. ContingencyAn allowance for site surprisesPercentage of subtotal

Which quantities can you measure from a plan?

If your plan is to scale, you can read most quantities from it. PoolSketch's takeoffs report surface area, perimeter, average depth, volume in gallons, coping and tile in linear feet, interior and deck in square feet and rough excavation in cubic yards. They are in the PDF crew layout sheet, so the estimator and the crew work from the same numbers.

Takeoffs are rough quantities from a concept plan. Confirm each one against the final design before you order materials.

What do estimates commonly leave out?

  • Access: removing fence or trees, matting for equipment, crane or pump truck.
  • Soil and groundwater: rock, poor soil, dewatering, extra steel or engineering.
  • Utilities: moving lines, new electrical service, gas for a heater.
  • Drainage and grading, retaining walls, and restoring the yard.
  • Permit, inspection and HOA fees, and the time they add.
  • Fence or barrier required by local rules.
  • Sales tax and financing costs where they apply.

List the exclusions in writing on the estimate. It prevents most disagreements.

How do you use this with a quick sketch?

Sketch the pool with the homeowner, read the quantities, fill in the template with your costs and send the PDF with option A and option B. The customer sees the picture and the choices the same day, and you keep the estimate details for yourself.

Start your 14 day free trial

Common questions

Is this template a price list?

No. It is an outline of lines and where each quantity comes from. You add your own unit costs.

How much contingency should I include?

It depends on how well you know the site and how firm the scope is. Many contractors use a percentage of the subtotal and raise it when access, soil or utilities are uncertain.

Does PoolSketch produce an estimate?

It produces takeoff quantities and a branded PDF handout. It does not price a job.