Help
Glossary of terms
3 min read
Goal: Know what the words in the app mean.
Steps
- Coping: the stones or cap on the edge of the pool.
- Waterline tile: the tile band at the water line.
- Setback: the minimum distance a piece must keep from a line or another piece.
- Plan: the drawing from above, like a floor plan.
- Section: a cut through the pool that shows depths.
- Takeoff: the quantities for pricing, shown in Specs and quantities.
- Survey: the property drawing the customer or the city gave you.
- DXF: a CAD file you can open in most drawing programs.